Well Placement Optimization
The Wells Placement Optimizer (WPO) places wells to maximise connection to a chosen property.
The engineer selects the property whose sum over well connected cells is to be maximized. Typically the user would select the hydrocarbon in place at a given date.
Several well trajectory parameters can be varied by the optimizer, such as azimuth, inclination, drain length.
Some zones can be excluded from the trajectories or perforation intervals (examples : faults, water zones, …).
The optimized well pattern can easily be integrated into a simulation deck.